Property Owner

Daniel Diaz, Goliad Grant LLC

6430 Sunset Drive, Miami, Florida 33143
Daniel Diaz

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$5.6M
Portfolio Value
0
Not closed · shown
323,342
Sq ft · shown
1
Cities · shown
$5.6M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Daniel Diaz, Goliad Grant LLC files a new project.

Export full work history

Download Daniel Diaz, Goliad Grant LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Daniel Diaz, Goliad Grant LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Daniel Diaz, Goliad Grant LLC

Daniel Diaz, Goliad Grant LLC is named as an owner in 1 construction filings in the San Antonio area, with a reported portfolio value of $5.6M. The 1 loaded filings include 1 new construction records and 0 renovation/alteration records, representing 323,342 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $5.6M
  • Square footage in shown records: 323,342 sq ft

Market Presence

  • San Antonio1 projects

Among these 1 loaded filings, 0 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including Munoz and Co.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2020
1
Median project: $5.6MAvg cost/sqft: $17/sqftPeak year: 2020 (1 projects)

Activity Timeline

First Project
Feb 2020
Latest Project
Feb 2020
0
Not closed
1
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$5.6M combined

Project Status

Closed
1(100%)

All Projects

1 total · Sorted by date