Property Owner3 not closed in shown records

GABLES

BEN DAVIS 6850 AUSTIN CENTER BLVD., AUSTIN, TX 78731

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 16 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

16
Total Projects
$3.7M
Portfolio Value
3
Not closed · shown
—
Sq ft · shown
4
Cities · shown
$232K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time GABLES files a new project.

Export full work history

Download GABLES's complete project record — and companies like it — as a CSV.

Browse data lists
Related to GABLES

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About GABLES

GABLES is named as an owner in 16 construction filings across Dallas-Fort Worth, Houston, Austin-Central Texas, with a reported portfolio value of $3.7M. The 16 loaded filings include 8 new construction records and 8 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 8 new construction projects (50%)
  • 8 renovation projects (50%)
  • Average disclosed value in shown filings: $232K
  • Square footage in shown records: — sq ft

Market Presence

  • Houston12 projects
  • Irving2 projects
  • Las Colinas1 projects
  • Austin1 projects

Among these 16 loaded filings, 3 have a reported status other than Project Closed and 13 are marked Project Closed. The records cover 4 cities and name design firms including GENSLER, WANG ENGINEERING INC, DESIGN HOUND. These are filing statuses, not independent observations of work on site.

Activity Over Time

2010
1
2011
5
2012
6
2016
1
2017
1
2018
2
Median project: $120KPeak year: 2012 (6 projects)

Activity Timeline

First Project
Aug 2010
Latest Project
Mar 2018
3
Not closed
13
Source closed

Project Status

Closed
13(81%)
Inspection Complete
3(19%)