Property Owner1 not closed in shown records

GATEWAY FELLOWSHIP CHURCH

MIKE GRIFFIN 10907 WEST LOOP 1604 NORTH, SAN ANTONIO, TX 78254

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$4.7M
Portfolio Value
1
Not closed · shown
—
Sq ft · shown
1
Cities · shown
$4.7M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time GATEWAY FELLOWSHIP CHURCH files a new project.

Export full work history

Download GATEWAY FELLOWSHIP CHURCH's complete project record — and companies like it — as a CSV.

Browse data lists
Related to GATEWAY FELLOWSHIP CHURCH

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About GATEWAY FELLOWSHIP CHURCH

GATEWAY FELLOWSHIP CHURCH is named as an owner in 1 construction filings in the San Antonio area, with a reported portfolio value of $4.7M. The 1 loaded filings include 0 new construction records and 0 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $4.7M
  • Square footage in shown records: — sq ft

Market Presence

  • San Antonio1 projects

Among these 1 loaded filings, 1 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including VISIONEERING STUDIOS ARCHITECTURE. These are filing statuses, not independent observations of work on site.

Activity Over Time

2017
1
Median project: $4.7MPeak year: 2017 (1 projects)

Activity Timeline

First Project
May 2017
Latest Project
May 2017
1
Not closed
0
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$4.7M combined

Project Status

Inspection Complete
1(100%)

All Projects

1 total · Sorted by date