Property Owner

GOSPEL FOR ASIA

CODY CARNINE 1800 GOLDEN TRAIL CT,, CARROLLTON, TX 75010

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$23.0M
Portfolio Value
0
Not closed · shown
—
Sq ft · shown
1
Cities · shown
$11.5M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time GOSPEL FOR ASIA files a new project.

Export full work history

Download GOSPEL FOR ASIA's complete project record — and companies like it — as a CSV.

Browse data lists
Related to GOSPEL FOR ASIA

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About GOSPEL FOR ASIA

GOSPEL FOR ASIA is named as an owner in 2 construction filings in Van Zandt County, Texas, with a reported portfolio value of $23.0M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $11.5M
  • Square footage in shown records: — sq ft

Market Presence

  • Wills Point2 projects

Among these 2 loaded filings, 0 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including HH ARCHITECTS. These are filing statuses, not independent observations of work on site.

Market Position

#4,587
of 96,056+ Texas property owners
by portfolio value
Top markets
Wills Point

Activity Over Time

2012
1
2013
1
Median project: $20.0MPeak year: 2012 (1 projects)

Activity Timeline

First Project
Oct 2012
Latest Project
Dec 2013
0
Not closed
2
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$23.0M combined

Project Status

Closed
2(100%)