Property Owner2 not closed in shown records

HARMONY BROTHERS LLC

3315 SABLE CRK, CONVERSE, Texas 78109

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$1.6M
Portfolio Value
2
Not closed · shown
6,873
Sq ft · shown
1
Cities · shown
$775K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time HARMONY BROTHERS LLC files a new project.

Export full work history

Download HARMONY BROTHERS LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to HARMONY BROTHERS LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About HARMONY BROTHERS LLC

HARMONY BROTHERS LLC is named as an owner in 2 construction filings in the San Antonio area, with a reported portfolio value of $1.6M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing 6,873 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $775K
  • Square footage in shown records: 6,873 sq ft

Market Presence

  • Leon Valley2 projects

Among these 2 loaded filings, 2 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including OPEN STUDIO ARCHITECTURE, Open Studio Architecture, PLLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2026
2
Median project: $1.3MAvg cost/sqft: $200/sqftPeak year: 2026 (2 projects)

Activity Timeline

First Project
Jan 2026
Latest Project
Feb 2026
2
Not closed
0
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$1.6M combined

Project Status

Review Complete
2(100%)