Property Owner3 not closed in shown records

KROGER CO., THE

RICHARD BINKLEY 751 FREEPORT PARKWAY, COPPELL, TX 75019

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 14 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

14
Total Projects
$8.1M
Portfolio Value
3
Not closed · shown
—
Sq ft · shown
11
Cities · shown
$575K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time KROGER CO., THE files a new project.

Export full work history

Download KROGER CO., THE's complete project record — and companies like it — as a CSV.

Browse data lists
Related to KROGER CO., THE

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About KROGER CO., THE

KROGER CO., THE is named as an owner in 14 construction filings in Dallas-Fort Worth and Houston, with a reported portfolio value of $8.1M. The 14 loaded filings include 12 new construction records and 1 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 12 new construction projects (86%)
  • 1 renovation projects (7%)
  • Average disclosed value in shown filings: $575K
  • Square footage in shown records: — sq ft

Market Presence

  • Fort Worth3 projects
  • Arlington2 projects
  • Prosper1 projects
  • Desoto1 projects

Among these 14 loaded filings, 3 have a reported status other than Project Closed and 11 are marked Project Closed. The records cover 11 cities and name design firms including CEI ENGINEERING ASSOCIATES INC., CEI ENGINEERING ASSOCIATES, JIM EVANS. These are filing statuses, not independent observations of work on site.

Activity Over Time

2010
1
2013
1
2014
2
2015
2
2016
6
2017
2
Median project: $600KPeak year: 2016 (6 projects)

Activity Timeline

First Project
Mar 2010
Latest Project
Jul 2017
3
Not closed
11
Source closed

Project Status

Closed
11(79%)
Registered
2(14%)
Inspection Complete
1(7%)

All Projects

14 total · Sorted by date