METHODIST HEALTHCARE SYSTEM
The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 54 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.
Claim this profile
Add your logo, contact info, and a lead capture form. From $29/mo.
Track this company
Get an email alert the next time METHODIST HEALTHCARE SYSTEM files a new project.
Export full work history
Download METHODIST HEALTHCARE SYSTEM's complete project record — and companies like it — as a CSV.
Browse data listsEvery company tracking $10M+ in active construction project value
About METHODIST HEALTHCARE SYSTEM
METHODIST HEALTHCARE SYSTEM is named as an owner in 54 construction filings in the San Antonio area, with a reported portfolio value of $44.2M. The 54 loaded filings include 2 new construction records and 50 renovation/alteration records, representing 7,900 square feet of reported floor area. These filings do not establish completed development or current property ownership.
Work Items
- 2 new construction projects (4%)
- 50 renovation projects (93%)
- Average disclosed value in shown filings: $818K
- Square footage in shown records: 7,900 sq ft
Market Presence
- San Antonio52 projects
- Live Oak2 projects
Among these 54 loaded filings, 2 have a reported status other than Project Closed and 52 are marked Project Closed. The records cover 2 cities and name design firms including LK DESIGN GROUP INC., LK DESIGN GROUP, MARMON MOK ARCHITECTURE. These are filing statuses, not independent observations of work on site.
Market Position
Activity Over Time
Activity Timeline
Project Locations
Design Partners
6 architecture firms