Property Owner3 not closed in shown records

MP Shops at Highland Village LLC

2 Seaport Lane 3680 Alexia Place, Boston, Massachusetts 02210
Ekta Patel

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 10 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

10
Total Projects
$3.6M
Portfolio Value
3
Not closed · shown
40,817
Sq ft · shown
1
Cities · shown
$357K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time MP Shops at Highland Village LLC files a new project.

Export full work history

Download MP Shops at Highland Village LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to MP Shops at Highland Village LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About MP Shops at Highland Village LLC

MP Shops at Highland Village LLC is named as an owner in 10 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $3.6M. The 10 loaded filings include 0 new construction records and 10 renovation/alteration records, representing 40,817 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 10 renovation projects (100%)
  • Average disclosed value in shown filings: $357K
  • Square footage in shown records: 40,817 sq ft

Market Presence

  • Highland Village10 projects

Among these 10 loaded filings, 3 have a reported status other than Project Closed and 7 are marked Project Closed. The records cover 1 cities and name design firms including Jerry Cox Architect, Kamus + Keller Inc., Ocio Design Group. These are filing statuses, not independent observations of work on site.

Activity Over Time

2019
1
2020
2
2023
1
2024
1
2025
2
2026
3
Median project: $260KAvg cost/sqft: $82/sqftPeak year: 2026 (3 projects)

Activity Timeline

First Project
Oct 2019
Latest Project
Oct 2026
3
Not closed
7
Source closed

Project Locations

Project Status

Closed
7(70%)
Review Complete
2(20%)
Registered
1(10%)