Property Owner1 not closed in shown records

Operation Liberty Hill

1401 N. Hwy. 183, Leander, Texas 78641
Larry J. Gabel

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$2.4M
Portfolio Value
1
Not closed · shown
12,400
Sq ft · shown
1
Cities · shown
$2.4M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Operation Liberty Hill files a new project.

Export full work history

Download Operation Liberty Hill's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Operation Liberty Hill

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About Operation Liberty Hill

Operation Liberty Hill is named as an owner in 1 construction filings in the Austin-Central Texas area, with a reported portfolio value of $2.4M. The 1 loaded filings include 1 new construction records and 0 renovation/alteration records, representing 12,400 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $2.4M
  • Square footage in shown records: 12,400 sq ft

Market Presence

  • Liberty Hill1 projects

Among these 1 loaded filings, 1 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Trine Engineering, LLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2025
1
Median project: $2.4MAvg cost/sqft: $194/sqftPeak year: 2025 (1 projects)

Activity Timeline

First Project
Aug 2025
Latest Project
Aug 2025
1
Not closed
0
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$2.4M combined

Project Status

Registered
1(100%)

All Projects

1 total · Sorted by date