Property Owner

PATRICK H NOLAN

PATRICK H NOLAN 6001 HOLLY RD, CORPUS CHRISTI, TX 78412

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$1.8M
Portfolio Value
0
Not closed · shown
—
Sq ft · shown
3
Cities · shown
$604K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time PATRICK H NOLAN files a new project.

Export full work history

Download PATRICK H NOLAN's complete project record — and companies like it — as a CSV.

Browse data lists
Related to PATRICK H NOLAN

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About PATRICK H NOLAN

PATRICK H NOLAN is named as an owner in 3 construction filings across Corpus Christi, Houston, Victoria County, with a reported portfolio value of $1.8M. The 3 loaded filings include 2 new construction records and 0 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (67%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $604K
  • Square footage in shown records: — sq ft

Market Presence

  • Corpus Christi1 projects
  • Victoria1 projects
  • Rosenberg1 projects

Among these 3 loaded filings, 0 have a reported status other than Project Closed and 3 are marked Project Closed. The records cover 3 cities and name design firms including BALUSEK-FRANKSON ENGINEERS & SURVEYORS, BALUSEK-FRANKSON. These are filing statuses, not independent observations of work on site.

Activity Over Time

2012
1
2013
1
2016
1
Median project: $528KPeak year: 2012 (1 projects)

Activity Timeline

First Project
Sep 2012
Latest Project
Jun 2016
0
Not closed
3
Source closed

Design Partners

2 architecture firms

2 total design firms worked with$1.8M combined

Project Status

Closed
3(100%)