Property Owner

PNC Design and Construction Services

8333 Douglas Avenue Douglas Tower, Dallas, Texas 75225
Charles Pantangco

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$2.2M
Portfolio Value
0
Not closed · shown
14,471
Sq ft · shown
3
Cities · shown
$722K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time PNC Design and Construction Services files a new project.

Export full work history

Download PNC Design and Construction Services's complete project record — and companies like it — as a CSV.

Browse data lists
Related to PNC Design and Construction Services

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About PNC Design and Construction Services

PNC Design and Construction Services is named as an owner in 3 construction filings in Laredo and Dallas-Fort Worth, with a reported portfolio value of $2.2M. The 3 loaded filings include 1 new construction records and 2 renovation/alteration records, representing 14,471 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (33%)
  • 2 renovation projects (67%)
  • Average disclosed value in shown filings: $722K
  • Square footage in shown records: 14,471 sq ft

Market Presence

  • Laredo1 projects
  • Frisco1 projects
  • Dallas1 projects

Among these 3 loaded filings, 0 have a reported status other than Project Closed and 3 are marked Project Closed. The records cover 3 cities and name design firms including GPD Professional Corporation, GPD GROUP PROFESSIONAL CORPORATION. These are filing statuses, not independent observations of work on site.

Activity Over Time

2022
3
Median project: $591KAvg cost/sqft: $171/sqftPeak year: 2022 (3 projects)

Activity Timeline

First Project
Apr 2022
Latest Project
Oct 2022
0
Not closed
3
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$1.6M combined

Project Status

Closed
3(100%)