Property Owner2 not closed in shown records

PPE GCW, LP

2000 Bering Drive, Suite 701, Houston, Texas 77057

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$30.0M
Portfolio Value
2
Not closed · shown
618,667
Sq ft · shown
1
Cities · shown
$15.0M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time PPE GCW, LP files a new project.

Export full work history

Download PPE GCW, LP's complete project record — and companies like it — as a CSV.

Browse data lists
Related to PPE GCW, LP

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About PPE GCW, LP

PPE GCW, LP is named as an owner in 2 construction filings in the Houston area, with a reported portfolio value of $30.0M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing 618,667 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $15.0M
  • Square footage in shown records: 618,667 sq ft

Market Presence

  • Katy2 projects

Among these 2 loaded filings, 2 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Method Architecture. These are filing statuses, not independent observations of work on site.

Market Position

#3,701
of 95,855+ Texas property owners
by portfolio value
Top markets
Katy

Activity Over Time

2026
2
Median project: $21.8MAvg cost/sqft: $48/sqftPeak year: 2026 (2 projects)

Activity Timeline

First Project
Mar 2026
Latest Project
Mar 2026
2
Not closed
0
Source closed

Project Locations

Counties

Design Partners

1 architecture firms

1 total design firms worked with$30.0M combined

Project Status

Review Complete
2(100%)