Property Owner

PREMIUM OUTLETS/SIMON

DIANE DUNHAM 105 EISENHOWER PARKWAY, ROSELAND, NJ 07068

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 8 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

8
Total Projects
$1.8M
Portfolio Value
0
Not closed · shown
—
Sq ft · shown
5
Cities · shown
$229K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time PREMIUM OUTLETS/SIMON files a new project.

Export full work history

Download PREMIUM OUTLETS/SIMON's complete project record — and companies like it — as a CSV.

Browse data lists
Related to PREMIUM OUTLETS/SIMON

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About PREMIUM OUTLETS/SIMON

PREMIUM OUTLETS/SIMON is named as an owner in 8 construction filings across Dallas-Fort Worth, Austin-Central Texas, Rio Grande Valley, Houston, with a reported portfolio value of $1.8M. The 8 loaded filings include 1 new construction records and 6 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (13%)
  • 6 renovation projects (75%)
  • Average disclosed value in shown filings: $229K
  • Square footage in shown records: — sq ft

Market Presence

  • San Marcos2 projects
  • Mercedes2 projects
  • Grand Prairie2 projects
  • Allen1 projects

Among these 8 loaded filings, 0 have a reported status other than Project Closed and 8 are marked Project Closed. The records cover 5 cities and name design firms including C.M. ARCHITECTURE P.A., SARGENTI ARCHITECTS, PATRICK C. BROCKMAN A.I.A.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2012
6
2013
1
2014
1
Median project: $150KPeak year: 2012 (6 projects)