Property Owner8 not closed in shown records

RFL No. 4 LP

104 S. Cascade Suite 90, Colorado Springs, Colorado 80903
James Warmack

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 10 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

10
Total Projects
$2.7M
Portfolio Value
8
Not closed · shown
76,198
Sq ft · shown
1
Cities · shown
$266K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time RFL No. 4 LP files a new project.

Export full work history

Download RFL No. 4 LP's complete project record — and companies like it — as a CSV.

Browse data lists
Related to RFL No. 4 LP

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About RFL No. 4 LP

RFL No. 4 LP is named as an owner in 10 construction filings in the Houston area, with a reported portfolio value of $2.7M. The 10 loaded filings include 0 new construction records and 10 renovation/alteration records, representing 76,198 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 10 renovation projects (100%)
  • Average disclosed value in shown filings: $266K
  • Square footage in shown records: 76,198 sq ft

Market Presence

  • The Woodlands10 projects

Among these 10 loaded filings, 8 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including Ziegler Copper Architects, Ziegler Cooper Architects, Ziegler Cooper Arcitects. These are filing statuses, not independent observations of work on site.

Activity Over Time

2024
1
2025
1
2026
8
Median project: $244KAvg cost/sqft: $61/sqftPeak year: 2026 (8 projects)

Activity Timeline

First Project
Sep 2024
Latest Project
Sep 2026
8
Not closed
2
Source closed

Project Locations

Project Status

Inspection Complete
7(70%)
Closed
2(20%)
Registered
1(10%)