Property Owner

RIVER SPRINGS AT BARGE RANCH GP LLC

BILL BARGE 2005 BIRD CREEK DR STE 211, TEMPLE, TX 76502

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$9.0M
Portfolio Value
0
Not closed · shown
Sq ft · shown
1
Cities · shown
$9.0M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time RIVER SPRINGS AT BARGE RANCH GP LLC files a new project.

Export full work history

Download RIVER SPRINGS AT BARGE RANCH GP LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to RIVER SPRINGS AT BARGE RANCH GP LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About RIVER SPRINGS AT BARGE RANCH GP LLC

RIVER SPRINGS AT BARGE RANCH GP LLC is named as an owner in 1 construction filings in the Killeen-Temple area, with a reported portfolio value of $9.0M. The 1 loaded filings include 1 new construction records and 0 renovation/alteration records, representing square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $9.0M
  • Square footage in shown records: sq ft

Market Presence

  • Belton1 projects

Among these 1 loaded filings, 0 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including WOMACK-HAMPTON ARCHITECTS LLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2012
1
Median project: $9.0MPeak year: 2012 (1 projects)

Activity Timeline

First Project
Aug 2012
Latest Project
Aug 2012
0
Not closed
1
Source closed

Project Locations

Counties

Design Partners

1 architecture firms

1 total design firms worked with$9.0M combined

Project Status

Closed
1(100%)

All Projects

1 total · Sorted by date