Property Owner1 not closed in shown records

RIVERSIDE INTERESTS LP

PO Box 30264, Austin, Texas 78703

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$1.8M
Portfolio Value
1
Not closed · shown
4,270
Sq ft · shown
1
Cities · shown
$908K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time RIVERSIDE INTERESTS LP files a new project.

Export full work history

Download RIVERSIDE INTERESTS LP's complete project record — and companies like it — as a CSV.

Browse data lists
Related to RIVERSIDE INTERESTS LP

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About RIVERSIDE INTERESTS LP

RIVERSIDE INTERESTS LP is named as an owner in 2 construction filings in the Austin-Central Texas area, with a reported portfolio value of $1.8M. The 2 loaded filings include 1 new construction records and 1 renovation/alteration records, representing 4,270 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (50%)
  • 1 renovation projects (50%)
  • Average disclosed value in shown filings: $908K
  • Square footage in shown records: 4,270 sq ft

Market Presence

  • Austin2 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including NEWTON Architecture, HADDON+COWAN ARCHITECTS. These are filing statuses, not independent observations of work on site.

Activity Over Time

2017
1
2026
1
Median project: $916KAvg cost/sqft: $214/sqftPeak year: 2017 (1 projects)

Activity Timeline

First Project
Jan 2017
Latest Project
Sep 2026
1
Not closed
1
Source closed

Project Locations

Project Status

Review Complete
1(50%)
Closed
1(50%)