Property Owner9 not closed in shown records

ROD Project Owner, LLC

1510 West Loop South, Houston, Texas 77027
Robert Bernard

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 12 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

12
Total Projects
$6.9M
Portfolio Value
9
Not closed · shown
52,604
Sq ft · shown
1
Cities · shown
$573K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time ROD Project Owner, LLC files a new project.

Export full work history

Download ROD Project Owner, LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to ROD Project Owner, LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About ROD Project Owner, LLC

ROD Project Owner, LLC is named as an owner in 12 construction filings in Houston and Morris County, with a reported portfolio value of $6.9M. The 12 loaded filings include 0 new construction records and 12 renovation/alteration records, representing 52,604 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 12 renovation projects (100%)
  • Average disclosed value in shown filings: $573K
  • Square footage in shown records: 52,604 sq ft

Market Presence

  • Houston12 projects

Among these 12 loaded filings, 9 have a reported status other than Project Closed and 3 are marked Project Closed. The records cover 1 cities and name design firms including Gensler, Adam Golinczak Architecture PC, Kenneth Park Architect. These are filing statuses, not independent observations of work on site.

Activity Over Time

2022
1
2024
2
2025
7
2026
2
Median project: $500KAvg cost/sqft: $200/sqftPeak year: 2025 (7 projects)

Activity Timeline

First Project
Jan 2022
Latest Project
Jul 2026
9
Not closed
3
Source closed

Project Locations

Project Status

Inspection Complete
5(42%)
Review Complete
4(33%)
Closed
3(25%)