Property Owner2 not closed in shown records

SAN JACINTO COLLEGE

CHUCK SMITH 4624 FAIRMONT PARKWAY, PASADENA, TX 77504

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 7 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

7
Total Projects
$32.6M
Portfolio Value
2
Not closed · shown
—
Sq ft · shown
2
Cities · shown
$4.7M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time SAN JACINTO COLLEGE files a new project.

Export full work history

Download SAN JACINTO COLLEGE's complete project record — and companies like it — as a CSV.

Browse data lists
Related to SAN JACINTO COLLEGE

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About SAN JACINTO COLLEGE

SAN JACINTO COLLEGE is named as an owner in 7 construction filings in the Houston area, with a reported portfolio value of $32.6M. The 7 loaded filings include 2 new construction records and 5 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (29%)
  • 5 renovation projects (71%)
  • Average disclosed value in shown filings: $4.7M
  • Square footage in shown records: — sq ft

Market Presence

  • Pasadena4 projects
  • Houston3 projects

Among these 7 loaded filings, 2 have a reported status other than Project Closed and 5 are marked Project Closed. The records cover 2 cities and name design firms including GENSLER, PAGE SOUTHERLAND PAGE, HKS INC.. These are filing statuses, not independent observations of work on site.

Market Position

#3,505
of 95,908+ Texas property owners
by portfolio value
Top markets
PasadenaHouston

Activity Over Time

2012
1
2014
2
2015
1
2016
1
2018
2
Median project: $2.7MPeak year: 2014 (2 projects)

Activity Timeline

First Project
Nov 2012
Latest Project
Aug 2018
2
Not closed
5
Source closed

Project Locations

Project Status

Closed
5(71%)
Inspection Complete
2(29%)