Property Owner1 not closed in shown records

SEGUIN ELKS LODGE #1229

1331 CH Matthis JR, seguin, Texas 78155

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$2.0M
Portfolio Value
1
Not closed · shown
4,800
Sq ft · shown
1
Cities · shown
$656K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time SEGUIN ELKS LODGE #1229 files a new project.

Export full work history

Download SEGUIN ELKS LODGE #1229's complete project record — and companies like it — as a CSV.

Browse data lists
Related to SEGUIN ELKS LODGE #1229

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About SEGUIN ELKS LODGE #1229

SEGUIN ELKS LODGE #1229 is named as an owner in 3 construction filings in the San Antonio area, with a reported portfolio value of $2.0M. The 3 loaded filings include 0 new construction records and 3 renovation/alteration records, representing 4,800 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 3 renovation projects (100%)
  • Average disclosed value in shown filings: $656K
  • Square footage in shown records: 4,800 sq ft

Market Presence

  • Seguin3 projects

Among these 3 loaded filings, 1 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including TSG ARCHITECTS, TSG ARCHITECTS AIA. These are filing statuses, not independent observations of work on site.

Activity Over Time

2016
2
2024
1
Median project: $887KAvg cost/sqft: $29/sqftPeak year: 2016 (2 projects)

Activity Timeline

First Project
Aug 2016
Latest Project
Jun 2024
1
Not closed
2
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$1.8M combined

Project Status

Closed
2(67%)
Review Complete
1(33%)