Property Owner6 not closed in shown records

Stonebrook Circle LP

2626 Stonebrook Parkway Suite 100, Frisco, Texas 75034

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 6 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

6
Total Projects
$4.0M
Portfolio Value
6
Not closed · shown
45,727
Sq ft · shown
1
Cities · shown
$662K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Stonebrook Circle LP files a new project.

Export full work history

Download Stonebrook Circle LP's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Stonebrook Circle LP

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Stonebrook Circle LP

Stonebrook Circle LP is named as an owner in 6 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $4.0M. The 6 loaded filings include 3 new construction records and 3 renovation/alteration records, representing 45,727 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 3 new construction projects (50%)
  • 3 renovation projects (50%)
  • Average disclosed value in shown filings: $662K
  • Square footage in shown records: 45,727 sq ft

Market Presence

  • Frisco6 projects

Among these 6 loaded filings, 6 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Abaya Design Studio, Klemm Design, Interplan LLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2024
2
2025
1
2026
3
Median project: $1.0MAvg cost/sqft: $146/sqftPeak year: 2026 (3 projects)

Activity Timeline

First Project
Oct 2024
Latest Project
Nov 2026
6
Not closed
0
Source closed

Project Locations

Project Status

Review Complete
3(50%)
Inspection Complete
2(33%)
Registered
1(17%)