Property Owner3 not closed in shown records

Taco Palenque Group

270 N Loop 1604 E Suite 210, San Antonio, Texas 78232
Javier Peresbarbosa

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 4 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

4
Total Projects
$3.0M
Portfolio Value
3
Not closed · shown
16,800
Sq ft · shown
2
Cities · shown
$750K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Taco Palenque Group files a new project.

Export full work history

Download Taco Palenque Group's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Taco Palenque Group

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Taco Palenque Group

Taco Palenque Group is named as an owner in 4 construction filings in Houston and San Antonio, with a reported portfolio value of $3.0M. The 4 loaded filings include 1 new construction records and 3 renovation/alteration records, representing 16,800 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (25%)
  • 3 renovation projects (75%)
  • Average disclosed value in shown filings: $750K
  • Square footage in shown records: 16,800 sq ft

Market Presence

  • San Antonio3 projects
  • Cypress1 projects

Among these 4 loaded filings, 3 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 2 cities and name design firms including CG5 Architect LLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2020
1
2023
2
2026
1
Median project: $750KAvg cost/sqft: $174/sqftPeak year: 2023 (2 projects)

Activity Timeline

First Project
Dec 2020
Latest Project
Feb 2026
3
Not closed
1
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$1.8M combined

Project Status

Registered
2(50%)
Review Complete
1(25%)
Closed
1(25%)