Property Owner1 not closed in shown records

TANNER-MAYHALL LLC

1808 HARWOOD CT, HURST, Texas 76054

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$1.1M
Portfolio Value
1
Not closed · shown
2,030
Sq ft · shown
2
Cities · shown
$535K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time TANNER-MAYHALL LLC files a new project.

Export full work history

Download TANNER-MAYHALL LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to TANNER-MAYHALL LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About TANNER-MAYHALL LLC

TANNER-MAYHALL LLC is named as an owner in 2 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $1.1M. The 2 loaded filings include 1 new construction records and 1 renovation/alteration records, representing 2,030 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (50%)
  • 1 renovation projects (50%)
  • Average disclosed value in shown filings: $535K
  • Square footage in shown records: 2,030 sq ft

Market Presence

  • Fort Worth1 projects
  • Richland Hills1 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 2 cities and name design firms including JAW ARCHITECTS, INC, OCULAS INC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2015
1
2026
1
Median project: $1.0MAvg cost/sqft: $493/sqftPeak year: 2015 (1 projects)

Activity Timeline

First Project
Mar 2015
Latest Project
Jun 2026
1
Not closed
1
Source closed

Design Partners

2 architecture firms

2 total design firms worked with$1.1M combined

Project Status

Review Complete
1(50%)
Closed
1(50%)