Property Owner1 not closed in shown records

TAR ASSET FAIRFAX LP

6000 SEPULVEDA BLVD STE 1515, CULVER CITY, CALIFORNIA 90230
Jeff Hurst

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$275K
Portfolio Value
1
Not closed · shown
3,081
Sq ft · shown
1
Cities · shown
$138K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time TAR ASSET FAIRFAX LP files a new project.

Export full work history

Download TAR ASSET FAIRFAX LP's complete project record — and companies like it — as a CSV.

Browse data lists
Related to TAR ASSET FAIRFAX LP

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About TAR ASSET FAIRFAX LP

TAR ASSET FAIRFAX LP is named as an owner in 2 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $275K. The 2 loaded filings include 0 new construction records and 2 renovation/alteration records, representing 3,081 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 2 renovation projects (100%)
  • Average disclosed value in shown filings: $138K
  • Square footage in shown records: 3,081 sq ft

Market Presence

  • Grand Prairie2 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including Ward Architecture PLLC, CP ENGINEERING INC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2018
1
2021
1
Median project: $155KAvg cost/sqft: $60,025/sqftPeak year: 2018 (1 projects)

Activity Timeline

First Project
Jul 2018
Latest Project
Dec 2021
1
Not closed
1
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$275K combined

Project Status

Closed
1(50%)
Registered
1(50%)