Property Owner1 not closed in shown records

TEXAS FACILITY COMMISSION

JOHN RAFF 1711 SAN JACINTO, AUSTIN, TX 78701

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$312K
Portfolio Value
1
Not closed · shown
—
Sq ft · shown
1
Cities · shown
$156K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time TEXAS FACILITY COMMISSION files a new project.

Export full work history

Download TEXAS FACILITY COMMISSION's complete project record — and companies like it — as a CSV.

Browse data lists
Related to TEXAS FACILITY COMMISSION

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About TEXAS FACILITY COMMISSION

TEXAS FACILITY COMMISSION is named as an owner in 2 construction filings in the Austin-Central Texas area, with a reported portfolio value of $312K. The 2 loaded filings include 0 new construction records and 2 renovation/alteration records, representing — square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 2 renovation projects (100%)
  • Average disclosed value in shown filings: $156K
  • Square footage in shown records: — sq ft

Market Presence

  • Austin2 projects

Among these 2 loaded filings, 1 have a reported status other than Project Closed and 1 are marked Project Closed. The records cover 1 cities and name design firms including TEXAS FACILITY COMMISION, AON FIRE PROTECTION ENGINEERING CORP.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2012
1
2016
1
Median project: $200KPeak year: 2012 (1 projects)

Activity Timeline

First Project
Jan 2012
Latest Project
Jun 2016
1
Not closed
1
Source closed

Project Locations

Project Status

Inspection Complete
1(50%)
Closed
1(50%)