Property Owner1 not closed in shown records

The Crow Group

4600 SECLUDED HOLLOW, AUSTIN, TEXAS 78727
Ingrid Crow

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$5.5M
Portfolio Value
1
Not closed · shown
31,127
Sq ft · shown
1
Cities · shown
$1.9M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time The Crow Group files a new project.

Export full work history

Download The Crow Group's complete project record — and companies like it — as a CSV.

Browse data lists
Related to The Crow Group

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About The Crow Group

The Crow Group is named as an owner in 3 construction filings in the Austin-Central Texas area, with a reported portfolio value of $5.5M. The 3 loaded filings include 2 new construction records and 1 renovation/alteration records, representing 31,127 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (67%)
  • 1 renovation projects (33%)
  • Average disclosed value in shown filings: $1.9M
  • Square footage in shown records: 31,127 sq ft

Market Presence

  • Round Rock3 projects

Among these 3 loaded filings, 1 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including Abel Design Group, Stantec, Ochona Development and Architecture. These are filing statuses, not independent observations of work on site.

Activity Over Time

2021
1
2022
2
Median project: $350KAvg cost/sqft: $116/sqftPeak year: 2022 (2 projects)

Activity Timeline

First Project
Jan 2021
Latest Project
Nov 2022
1
Not closed
2
Source closed

Project Locations

Project Status

Closed
2(67%)
Inspection Complete
1(33%)