Property Owner1 not closed in shown records

THOMPSON, TODD BRUCE ETUX ALISTAIR

6270 W ADAMS AVE _, TEMPLE, TX 76502

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$250K
Portfolio Value
1
Not closed · shown
Sq ft · shown
1
Cities · shown
$250K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time THOMPSON, TODD BRUCE ETUX ALISTAIR files a new project.

Export full work history

Download THOMPSON, TODD BRUCE ETUX ALISTAIR's complete project record — and companies like it — as a CSV.

Browse data lists
Related to THOMPSON, TODD BRUCE ETUX ALISTAIR

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About THOMPSON, TODD BRUCE ETUX ALISTAIR

THOMPSON, TODD BRUCE ETUX ALISTAIR is named as an owner in 1 construction filings in the Killeen-Temple area, with a reported portfolio value of $250K. The 1 loaded filings include 0 new construction records and 0 renovation/alteration records, representing square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $250K
  • Square footage in shown records: sq ft

Market Presence

  • Temple1 projects

Among these 1 loaded filings, 1 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including BELTON ENGINEERING INC.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2017
1
Median project: $250KPeak year: 2017 (1 projects)

Activity Timeline

First Project
Jan 2017
Latest Project
Jan 2017
1
Not closed
0
Source closed

Project Locations

Counties

Design Partners

1 architecture firms

1 total design firms worked with$250K combined

Project Status

Registered
1(100%)

All Projects

1 total · Sorted by date