Property Owner3 not closed in shown records

WALKER ENGINEERING

1505 W Walnut Hill Lane, Irving, Texas 75038
Keelan Jackson

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$10.8M
Portfolio Value
3
Not closed · shown
59,550
Sq ft · shown
1
Cities · shown
$3.6M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time WALKER ENGINEERING files a new project.

Export full work history

Download WALKER ENGINEERING's complete project record — and companies like it — as a CSV.

Browse data lists
Related to WALKER ENGINEERING

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About WALKER ENGINEERING

WALKER ENGINEERING is named as an owner in 3 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $10.8M. The 3 loaded filings include 2 new construction records and 1 renovation/alteration records, representing 59,550 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (67%)
  • 1 renovation projects (33%)
  • Average disclosed value in shown filings: $3.6M
  • Square footage in shown records: 59,550 sq ft

Market Presence

  • Irving3 projects

Among these 3 loaded filings, 3 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including PARSCALE GROUP, Parscale Group. These are filing statuses, not independent observations of work on site.

Activity Over Time

2025
2
2026
1
Median project: $2.8MAvg cost/sqft: $276/sqftPeak year: 2025 (2 projects)

Activity Timeline

First Project
Jun 2025
Latest Project
Aug 2026
3
Not closed
0
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$10.8M combined

Project Status

Registered
3(100%)