Ida Ridge Development
10/21/2025 DFD Editing status back to Approved and Released. Spoke with Inspector SMS and indicated to him that closing this SP at this time is not advisable. I reminded him and owner Vishal Dave that unpermitted activity (borrowing of material from the back end of the site, from a CWQZ, to facilitate construction at adjacent 10800 Ida Ridge) must be accounted for and that this SP must be extended or otherwise revived in order to avoid enforcement action. Owner was directed to rectify this situation ASAP. The applicant is proposing to construct a multi-family development. with associated improvements.
📊Site Plan Metrics
Approved and Released
Step 5 of 5: Released ✓Site plan fully approved and released. All conditions cleared. Ready for construction permitting.
📋Scope of Work
10/21/2025 DFD Editing status back to Approved and Released. Spoke with Inspector SMS and indicated to him that closing this SP at this time is not advisable. I reminded him and owner Vishal Dave that unpermitted activity (borrowing of material from the back end of the site, from a CWQZ, to facilitate construction at adjacent 10800 Ida Ridge) must be accounted for and that this SP must be extended or otherwise revived in order to avoid enforcement action. Owner was directed to rectify this situation ASAP. The applicant is proposing to construct a multi-family development. with associated improvements.
📅Entitlement Timeline
💰Property Tax Assessment
View on TCAD🤝 Project Team
📐 Nearby Site Plans
Zoning & Land Use
Environmental & Geographic
Case Manager
Explore Area
📌 Case Details
🔗 Related Cases
Legal Description
LOT 7 KINGS VILLAGE SEC 3 PLUS .1075 AC OF ADJ VAC ROW