1505 W North Loop
12/9/2025 DFD Inspector SMS conducted a 17-point closure review and determined that new work contemplated under this SP never began. There was a structure demolished and apparently two trees removed back in 2023. No inspections were ever conducted. This matter has been referred to EV enforcement. The applicant is proposing to construct a 3-story condominium complex with associated improvements.
📊Site Plan Metrics
#12584812Closed
Site plan case is in the system.
📋Scope of Work
12/9/2025 DFD Inspector SMS conducted a 17-point closure review and determined that new work contemplated under this SP never began. There was a structure demolished and apparently two trees removed back in 2023. No inspections were ever conducted. This matter has been referred to EV enforcement. The applicant is proposing to construct a 3-story condominium complex with associated improvements.
📅Entitlement Timeline
🤝 Project Team
Property Owner
Applicant / Developer
📐 Nearby Site Plans
Zoning & Land Use
Environmental & Geographic
Case Manager
Explore Area
📌 Case Details
Legal Description
LOT 1 TAYLOR FLAT NO 2