SUITE 301
SUITE 301 is a additions to existing building project at 709 HOLLYBROOK DR., Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2008). The project has an estimated value of $530K.
๐Project Metrics
TDLR #EABPRJA9801338Project Closed
Project has been completed and closed
SUITE 301 is a Additions to Existing Building project located at 709 HOLLYBROOK DR., Longview, TX 75604 in Longview, Texas. The project has an estimated value of $530K. LONGVIEW T.M.B. LLC is the property owner and LILLIBRIDGE is the design firm of record. The project was registered with TDLR on September 24, 2008.
โFrequently Asked Questions
What is SUITE 301?
SUITE 301 is a additions to existing building project at 709 HOLLYBROOK DR. in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New doctor's suite within an existing building.
Is SUITE 301 open in Longview?
Construction on SUITE 301 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2008. The building is finished and very likely open.
Where is SUITE 301 located?
SUITE 301 is located at 709 HOLLYBROOK DR., Longview, TX, 75604, in Gregg County.
Who is the owner or developer of SUITE 301?
LONGVIEW T.M.B. LLC is the property owner/developer of record for SUITE 301, per its TDLR project registration.
Who is the architect or design firm for SUITE 301?
LILLIBRIDGE is the design firm of record for SUITE 301, according to its TDLR filing.
How much does SUITE 301 cost and how big is it?
SUITE 301 has an estimated construction value of $530K, based on its TDLR filing.
๐Scope of Work
New doctor's suite within an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 24, 2008
Review Complete
Inspection Complete
Closed
Dec 1, 2008