Project intelligenceTDLR EABPRJA9810328Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO

101 MAYWOOD DRIVE, Waco, TX, 76712

Construction complete · Dec 2009Project Closed

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO is a renovation/alteration project at 101 MAYWOOD DRIVE, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2009). The project has an estimated value of $344K.

Estimated project value
$344K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 31, 2009245 days across supplied datesDec 1, 2009

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76712 (Waco)

One email per change. Unsubscribe in one click. Privacy.

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO is a Renovation/Alteration project located at 101 MAYWOOD DRIVE, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $344K. MIDWAY ISD is the property owner and HUCKABEE & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on March 31, 2009.

Frequently Asked Questions

What is MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO?

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO is a renovation/alteration project at 101 MAYWOOD DRIVE in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Elementary school renovations.VAR175

Is MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO open in Waco?

Construction on MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO is complete — TDLR records show the project passed its required accessibility inspection in Dec 2009. The building is finished and very likely open.

Where is MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO located?

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO is located at 101 MAYWOOD DRIVE, Waco, TX, 76712, in McLennan County.

Who is the owner or developer of MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO?

MIDWAY ISD is the property owner/developer of record for MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO, per its TDLR project registration.

Who is the architect or design firm for MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO?

HUCKABEE & ASSOCIATES INC. is the design firm of record for MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO, according to its TDLR filing.

How much does MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO cost and how big is it?

MIDWAY ISD-SPEEGLEVILLE ELEM SCHOOL RENO has an estimated construction value of $344K, based on its TDLR filing.

Scope of Work

Elementary school renovations.VAR175

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

101 MAYWOOD DRIVE, Waco, TX, 76712

31.56149, -97.29114

Watch all construction in 76712 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.