TIME WARNER CABLE
TIME WARNER CABLE is a renovation/alteration project at 750 CANYON DRIVE Suite 400, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2010). The project has an estimated value of $334K.
๐Project Metrics
TDLR #EABPRJB0808354Project Closed
Project has been completed and closed
TIME WARNER CABLE is a Renovation/Alteration project located at 750 CANYON DRIVE Suite 400, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $334K. CAPSTAR COMMERCIAL REAL ESTATE SERVICES is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on March 17, 2010.
โFrequently Asked Questions
What is TIME WARNER CABLE?
TIME WARNER CABLE is a renovation/alteration project at 750 CANYON DRIVE Suite 400 in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish-out of a lease space on a multi-tenant floor in a multiple-story office building.
Is TIME WARNER CABLE open in Coppell?
Construction on TIME WARNER CABLE is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2010. The building is finished and very likely open.
Where is TIME WARNER CABLE located?
TIME WARNER CABLE is located at 750 CANYON DRIVE Suite 400, Coppell, TX, 75019, in Dallas County.
Who is the owner or developer of TIME WARNER CABLE?
CAPSTAR COMMERCIAL REAL ESTATE SERVICES is the property owner/developer of record for TIME WARNER CABLE, per its TDLR project registration.
Who is the architect or design firm for TIME WARNER CABLE?
ENTOS DESIGN is the design firm of record for TIME WARNER CABLE, according to its TDLR filing.
How much does TIME WARNER CABLE cost and how big is it?
TIME WARNER CABLE has an estimated construction value of $334K, based on its TDLR filing.
๐Scope of Work
Interior finish-out of a lease space on a multi-tenant floor in a multiple-story office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2010
Review Complete
Inspection Complete
Closed
Jun 1, 2010