Project intelligenceTDLR EABPRJB0813783Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

THIRD FLOOR INTERIOR FINISH OUT in Dallas, TX

4100 HARRY HINES, Dallas, TX, 75219

Construction complete · Nov 2010Project Closed

THIRD FLOOR INTERIOR FINISH OUT is a renovation/alteration project at 4100 HARRY HINES, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2010). The project has an estimated value of $450K.

Estimated project value
$450K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 13, 2010111 days across supplied datesNov 1, 2010

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75219 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

THIRD FLOOR INTERIOR FINISH OUT is a Renovation/Alteration project located at 4100 HARRY HINES, Dallas, TX 75219 in Dallas, Texas. The project has an estimated value of $450K. 4100 HARRY HINES PARTNERS LP is the property owner and EVERGREEN ARCHITECTURAL GROUP is the design firm of record. The project was registered with TDLR on July 13, 2010.

Frequently Asked Questions

What is THIRD FLOOR INTERIOR FINISH OUT?

THIRD FLOOR INTERIOR FINISH OUT is a renovation/alteration project at 4100 HARRY HINES in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of the third floor of an existing four story building.

Is THIRD FLOOR INTERIOR FINISH OUT open in Dallas?

Construction on THIRD FLOOR INTERIOR FINISH OUT is complete — TDLR records show the project passed its required accessibility inspection in Nov 2010. The building is finished and very likely open.

Where is THIRD FLOOR INTERIOR FINISH OUT located?

THIRD FLOOR INTERIOR FINISH OUT is located at 4100 HARRY HINES, Dallas, TX, 75219, in Dallas County.

Who is the owner or developer of THIRD FLOOR INTERIOR FINISH OUT?

4100 HARRY HINES PARTNERS LP is the property owner/developer of record for THIRD FLOOR INTERIOR FINISH OUT, per its TDLR project registration.

Who is the architect or design firm for THIRD FLOOR INTERIOR FINISH OUT?

EVERGREEN ARCHITECTURAL GROUP is the design firm of record for THIRD FLOOR INTERIOR FINISH OUT, according to its TDLR filing.

How much does THIRD FLOOR INTERIOR FINISH OUT cost and how big is it?

THIRD FLOOR INTERIOR FINISH OUT has an estimated construction value of $450K, based on its TDLR filing.

Scope of Work

Interior finish out of the third floor of an existing four story building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4100 HARRY HINES, Dallas, TX, 75219

Loading location map…
32.80389, -96.82027

Watch all construction in 75219 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.