PHILLIPS ANKER
PHILLIPS ANKER is a renovation/alteration project at 10800 PECAN PARK BLVD. Ste 220, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2010). The project has an estimated value of $65K.
๐Project Metrics
TDLR #EABPRJB0815862Project Closed
Project has been completed and closed
PHILLIPS ANKER is a Renovation/Alteration project located at 10800 PECAN PARK BLVD. Ste 220, Austin, TX 78750 in Austin, Texas. The project has an estimated value of $65K. CB RICHARD ELLIS is the property owner and AO3 INC. is the design firm of record. The project was registered with TDLR on August 26, 2010.
โFrequently Asked Questions
What is PHILLIPS ANKER?
PHILLIPS ANKER is a renovation/alteration project at 10800 PECAN PARK BLVD. Ste 220 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Renovation/Alteration of existing lease space
Is PHILLIPS ANKER open in Austin?
Construction on PHILLIPS ANKER is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2010. The building is finished and very likely open.
Where is PHILLIPS ANKER located?
PHILLIPS ANKER is located at 10800 PECAN PARK BLVD. Ste 220, Austin, TX, 78750, in Travis County.
Who is the owner or developer of PHILLIPS ANKER?
CB RICHARD ELLIS is the property owner/developer of record for PHILLIPS ANKER, per its TDLR project registration.
Who is the architect or design firm for PHILLIPS ANKER?
AO3 INC. is the design firm of record for PHILLIPS ANKER, according to its TDLR filing.
How much does PHILLIPS ANKER cost and how big is it?
PHILLIPS ANKER has an estimated construction value of $65K, based on its TDLR filing.
๐Scope of Work
4.1.6 Renovation/Alteration of existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 26, 2010
Review Complete
Inspection Complete
Closed
Nov 1, 2010
๐Related Projects
๐คSame Owner
$99.1M total๐๏ธSame Design Firm
$32.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 3203
Replacement of complete existing central heat and air system with or without duct work
Electrical upgrade
COA full purpose-Bluebonnet Elec Utility. build 100 amp meter rack for entry sign monument. Ref: 2025-143955 EP at 10800 1/2 SILVER CLOUD COVE
Saddle Ridge
๐Related Site Plans
City of Austin site plan approvals at this location