CRISTA BROADCAST
CRISTA BROADCAST is a renovation/alteration project at 3600 A CAPITAL OF TX HWY Sute 200, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2011). The project has an estimated value of $350K.
๐Project Metrics
TDLR #EABPRJB1806349Project Closed
Project has been completed and closed
CRISTA BROADCAST is a Renovation/Alteration project located at 3600 A CAPITAL OF TX HWY Sute 200, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $350K. HPI REAL ESTATE SERVICES is the property owner and AO3 INC. is the design firm of record. The project was registered with TDLR on January 24, 2011.
โFrequently Asked Questions
What is CRISTA BROADCAST?
CRISTA BROADCAST is a renovation/alteration project at 3600 A CAPITAL OF TX HWY Sute 200 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Renovation/Alteration of existing lease space
Is CRISTA BROADCAST open in Austin?
Construction on CRISTA BROADCAST is complete โ TDLR records show the project passed its required accessibility inspection in May 2011. The building is finished and very likely open.
Where is CRISTA BROADCAST located?
CRISTA BROADCAST is located at 3600 A CAPITAL OF TX HWY Sute 200, Austin, TX, 78746, in Travis County.
Who is the owner or developer of CRISTA BROADCAST?
HPI REAL ESTATE SERVICES is the property owner/developer of record for CRISTA BROADCAST, per its TDLR project registration.
Who is the architect or design firm for CRISTA BROADCAST?
AO3 INC. is the design firm of record for CRISTA BROADCAST, according to its TDLR filing.
How much does CRISTA BROADCAST cost and how big is it?
CRISTA BROADCAST has an estimated construction value of $350K, based on its TDLR filing.
๐Scope of Work
4.1.6 Renovation/Alteration of existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 24, 2011
Review Complete
Inspection Complete
Closed
May 1, 2011
๐Related Projects
๐คSame Owner
$1.9M total๐๏ธSame Design Firm
$32.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Replacement of an existing water heater replace ng water heater
EM repair of 2.5 C for 225A panel feeders that faulted. Pulled new conductors and cut in pull points.
Per Tx Gas while they repair a gas leak on their main we need to relocate the gas meter away from windows electrical tankless crawl space vents.
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits]