Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
UPPER VALLEY DRAIN PH IV EQUESTRE DR. in El Paso, TX
MULBERRY AVE. TO REDD ROAD, El Paso, TX, 79932
UPPER VALLEY DRAIN PH IV EQUESTRE DR. is a renovation/alteration project at MULBERRY AVE. TO REDD ROAD, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2011). The project has an estimated value of $973K.
- Estimated project value
- $973K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
401 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
25 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79932 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
UPPER VALLEY DRAIN PH IV EQUESTRE DR. is a Renovation/Alteration project located at MULBERRY AVE. TO REDD ROAD, El Paso, TX 79932 in El Paso, Texas. The project has an estimated value of $973K. CITY OF EL PASO is the property owner and AIA ENGINEERS LTD. is the design firm of record. The project was registered with TDLR on June 6, 2011.
Frequently Asked Questions
What is UPPER VALLEY DRAIN PH IV EQUESTRE DR.?
UPPER VALLEY DRAIN PH IV EQUESTRE DR. is a renovation/alteration project at MULBERRY AVE. TO REDD ROAD in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Drainage improvements for a city street including pavement demolition, construction of new sidewalks, driveways,
Is UPPER VALLEY DRAIN PH IV EQUESTRE DR. open in El Paso?
Construction on UPPER VALLEY DRAIN PH IV EQUESTRE DR. is complete — TDLR records show the project passed its required accessibility inspection in Jul 2011. The building is finished and very likely open.
Where is UPPER VALLEY DRAIN PH IV EQUESTRE DR. located?
UPPER VALLEY DRAIN PH IV EQUESTRE DR. is located at MULBERRY AVE. TO REDD ROAD, El Paso, TX, 79932, in El Paso County.
Who is the owner or developer of UPPER VALLEY DRAIN PH IV EQUESTRE DR.?
CITY OF EL PASO is the property owner/developer of record for UPPER VALLEY DRAIN PH IV EQUESTRE DR., per its TDLR project registration.
Who is the architect or design firm for UPPER VALLEY DRAIN PH IV EQUESTRE DR.?
AIA ENGINEERS LTD. is the design firm of record for UPPER VALLEY DRAIN PH IV EQUESTRE DR., according to its TDLR filing.
How much does UPPER VALLEY DRAIN PH IV EQUESTRE DR. cost and how big is it?
UPPER VALLEY DRAIN PH IV EQUESTRE DR. has an estimated construction value of $973K, based on its TDLR filing.
Scope of Work
Drainage improvements for a city street including pavement demolition, construction of new sidewalks, driveways,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
MULBERRY AVE. TO REDD ROAD, El Paso, TX, 79932
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.15B totalWatch all construction in 79932 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.