Project intelligenceTDLR EABPRJB1813458Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 in Kilgore, TX

100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St., Kilgore, TX, 75662

Construction complete · Oct 2011Project Closed

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 is a renovation/alteration project at 100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St., Kilgore, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $1.2M.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 1, 2011122 days across supplied datesOct 1, 2011

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    113 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75662 (Kilgore)

One email per change. Unsubscribe in one click. Privacy.

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 is a Renovation/Alteration project located at 100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St., Kilgore, TX 75662 in Kilgore, Texas. The project has an estimated value of $1.2M. CITY OF KILGORE TX is the property owner and SCHAUMBURG & POLK INC. is the design firm of record. The project was registered with TDLR on June 10, 2011.

Frequently Asked Questions

What is DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2?

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 is a renovation/alteration project at 100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St. in Kilgore, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal and replacement of existing city sidewalk with new accessible concrete sidewalk, brick pavers, lights, b

Is DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 open in Kilgore?

Construction on DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.

Where is DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 located?

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 is located at 100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St., Kilgore, TX, 75662, in Gregg County.

Who is the owner or developer of DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2?

CITY OF KILGORE TX is the property owner/developer of record for DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2, per its TDLR project registration.

Who is the architect or design firm for DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2?

SCHAUMBURG & POLK INC. is the design firm of record for DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2, according to its TDLR filing.

How much does DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 cost and how big is it?

DOWNTOWN SIDEWALK ENHANCEMENTS PHSE 2 has an estimated construction value of $1.2M, based on its TDLR filing.

Scope of Work

Removal and replacement of existing city sidewalk with new accessible concrete sidewalk, brick pavers, lights, b

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

100 BLOCK OF E. MAIN ST. 100 block of N. Commerce St., Kilgore, TX, 75662

Loading location map…
32.38685, -94.87645

Watch all construction in 75662 (Kilgore)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.