CPL LABS
CPL LABS is a renovation/alteration project at 12450 NETWORK TECH BLVD, #102, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2011). The project has an estimated value of $234K.
๐Project Metrics
TDLR #EABPRJB2800290Project Closed
Project has been completed and closed
CPL LABS is a Renovation/Alteration project located at 12450 NETWORK TECH BLVD, #102, San Antonio, TX 78249 in San Antonio, Texas. The project has an estimated value of $234K. LIT FINANCE III LLC is the property owner and DUNNAM DESIGN GROUP INC. is the design firm of record. The project was registered with TDLR on September 8, 2011.
โFrequently Asked Questions
What is CPL LABS?
CPL LABS is a renovation/alteration project at 12450 NETWORK TECH BLVD, #102 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish-out in an existing building.
Is CPL LABS open in San Antonio?
Construction on CPL LABS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2011. The building is finished and very likely open.
Where is CPL LABS located?
CPL LABS is located at 12450 NETWORK TECH BLVD, #102, San Antonio, TX, 78249, in Bexar County.
Who is the owner or developer of CPL LABS?
LIT FINANCE III LLC is the property owner/developer of record for CPL LABS, per its TDLR project registration.
Who is the architect or design firm for CPL LABS?
DUNNAM DESIGN GROUP INC. is the design firm of record for CPL LABS, according to its TDLR filing.
How much does CPL LABS cost and how big is it?
CPL LABS has an estimated construction value of $234K, based on its TDLR filing.
๐Scope of Work
Interior tenant finish-out in an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 8, 2011
Review Complete
Inspection Complete
Closed
Dec 1, 2011