SHOE PALACE is a renovation/alteration project at 201 S CAP TX HWY D03A, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2011). The project has an estimated value of $75K.
Project has been completed and closed
SHOE PALACE is a Renovation/Alteration project located at 201 S CAP TX HWY D03A, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $75K. SIMON PROPERTY GROUP is the property owner and BAEK YOUNG AHN ARCHITECT is the design firm of record. The project was registered with TDLR on September 12, 2011.
SHOE PALACE is a renovation/alteration project at 201 S CAP TX HWY D03A in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: renovation to tenant space for new retail store
Construction on SHOE PALACE is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2011. The building is finished and very likely open.
SHOE PALACE is located at 201 S CAP TX HWY D03A, Austin, TX, 78746, in Travis County.
SIMON PROPERTY GROUP is the property owner/developer of record for SHOE PALACE, per its TDLR project registration.
BAEK YOUNG AHN ARCHITECT is the design firm of record for SHOE PALACE, according to its TDLR filing.
SHOE PALACE has an estimated construction value of $75K, based on its TDLR filing.
renovation to tenant space for new retail store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 12, 2011
Review Complete
Inspection Complete
Closed
Nov 1, 2011
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
Tunnel under the foundation to repair a break in the PVC drain line in the master bathroom and hall bathroom with SCH 40 PVC. There will be two access holds in front of and behind the house.
Partially enclosing the front porch area to add to the living room remodeling throughout of floors bathrooms closets and kitchen reinsulating the exterior walls and siding replacement. No change to impervious cover
Remove existing pool and replace with a new pool with the same specifications.
Bldg 1 Pool (176sf)