WESTWOOD H.S. BLEACHERS REPLACEMENT
๐Project Metrics
TDLR #EABPRJB6804261Project Closed
Project has been completed and closed
๐Scope of Work
The project consists of replacing the 30 year old original gymnasium bleachers with new bleachers.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Replacement of complete existing central heat and air system with or without duct work
Gym remodel: Remove 2 existing roof rafters and 1 existing bean install 2 posts each side of the wall install new beam across the total length of the room as per engineers design. Open roughly framing and install new window approximately 2x3. Run new AC ducts from the closet outlet and install new grills. Run wires and add 1 new outlet
Tower scope 1 Install new mount modification per plans 6 Cellmax antennas 3 Ericsson air antennas 3 Ericsson radios.
Replacement of an existing water heater