SAMPLE LAB
SAMPLE LAB is a renovation/alteration project at 806 PALUXY STREET, Kilgore, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2011). The project has an estimated value of $400K.
๐Project Metrics
TDLR #EABPRJB2802301Project Closed
Project has been completed and closed
SAMPLE LAB is a Renovation/Alteration project located at 806 PALUXY STREET, Kilgore, TX 75662 in Kilgore, Texas. The project has an estimated value of $400K. BAKER HUGHES OILFIELD OPERATIONS INC. is the property owner and ENERGY ARCHITECTURE is the design firm of record. The project was registered with TDLR on October 20, 2011.
โFrequently Asked Questions
What is SAMPLE LAB?
SAMPLE LAB is a renovation/alteration project at 806 PALUXY STREET in Kilgore, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovating existing lab into lab and new office space.
Is SAMPLE LAB open in Kilgore?
Construction on SAMPLE LAB is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2011. The building is finished and very likely open.
Where is SAMPLE LAB located?
SAMPLE LAB is located at 806 PALUXY STREET, Kilgore, TX, 75662, in Gregg County.
Who is the owner or developer of SAMPLE LAB?
BAKER HUGHES OILFIELD OPERATIONS INC. is the property owner/developer of record for SAMPLE LAB, per its TDLR project registration.
Who is the architect or design firm for SAMPLE LAB?
ENERGY ARCHITECTURE is the design firm of record for SAMPLE LAB, according to its TDLR filing.
How much does SAMPLE LAB cost and how big is it?
SAMPLE LAB has an estimated construction value of $400K, based on its TDLR filing.
๐Scope of Work
Renovating existing lab into lab and new office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 20, 2011
Review Complete
Inspection Complete
Closed
Dec 1, 2011