Project intelligenceTDLR EABPRJB2803311New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SAFE ROUTES TO SCHOOL - BONHAM in Temple, TX

4600 MIDWAY, Temple, TX, 76502

Construction complete · Jul 2012Project Closed

SAFE ROUTES TO SCHOOL - BONHAM is a new construction project at 4600 MIDWAY, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2012). The project has an estimated value of $412K.

Estimated project value
$412K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 9, 2011235 days across supplied datesJul 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    144 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76502 (Temple)

One email per change. Unsubscribe in one click. Privacy.

SAFE ROUTES TO SCHOOL - BONHAM is a New Construction project located at 4600 MIDWAY, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $412K. CITY OF TEMPLE is the property owner and BSP ENGINEERS INC. is the design firm of record. The project was registered with TDLR on November 9, 2011.

Frequently Asked Questions

What is SAFE ROUTES TO SCHOOL - BONHAM?

SAFE ROUTES TO SCHOOL - BONHAM is a new construction project at 4600 MIDWAY in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Misc. construction of concrete sidewalks, ramos, driveways, drainage structures, pavement markings and signage

Is SAFE ROUTES TO SCHOOL - BONHAM open in Temple?

Construction on SAFE ROUTES TO SCHOOL - BONHAM is complete — TDLR records show the project passed its required accessibility inspection in Jul 2012. The building is finished and very likely open.

Where is SAFE ROUTES TO SCHOOL - BONHAM located?

SAFE ROUTES TO SCHOOL - BONHAM is located at 4600 MIDWAY, Temple, TX, 76502, in Bell County.

Who is the owner or developer of SAFE ROUTES TO SCHOOL - BONHAM?

CITY OF TEMPLE is the property owner/developer of record for SAFE ROUTES TO SCHOOL - BONHAM, per its TDLR project registration.

Who is the architect or design firm for SAFE ROUTES TO SCHOOL - BONHAM?

BSP ENGINEERS INC. is the design firm of record for SAFE ROUTES TO SCHOOL - BONHAM, according to its TDLR filing.

How much does SAFE ROUTES TO SCHOOL - BONHAM cost and how big is it?

SAFE ROUTES TO SCHOOL - BONHAM has an estimated construction value of $412K, based on its TDLR filing.

Scope of Work

Misc. construction of concrete sidewalks, ramos, driveways, drainage structures, pavement markings and signage

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4600 MIDWAY, Temple, TX, 76502

Loading location map…
31.07686, -97.40109

Watch all construction in 76502 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.