INTEL AN4 FIT UP 1A
INTEL AN4 FIT UP 1A is a renovation/alteration project at 1300 SOUTH MOPAC EXPY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2012). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB2805004Project Closed
Project has been completed and closed
INTEL AN4 FIT UP 1A is a Renovation/Alteration project located at 1300 SOUTH MOPAC EXPY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $75K. INTEL CORPORATION is the property owner and PAGE SOUTHERLAND PAGE is the design firm of record. The project was registered with TDLR on December 14, 2011.
โFrequently Asked Questions
What is INTEL AN4 FIT UP 1A?
INTEL AN4 FIT UP 1A is a renovation/alteration project at 1300 SOUTH MOPAC EXPY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Renovation Alteration - renovation of existing space
Is INTEL AN4 FIT UP 1A open in Austin?
Construction on INTEL AN4 FIT UP 1A is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2012. The building is finished and very likely open.
Where is INTEL AN4 FIT UP 1A located?
INTEL AN4 FIT UP 1A is located at 1300 SOUTH MOPAC EXPY, Austin, TX, 78746, in Travis County.
Who is the owner or developer of INTEL AN4 FIT UP 1A?
INTEL CORPORATION is the property owner/developer of record for INTEL AN4 FIT UP 1A, per its TDLR project registration.
Who is the architect or design firm for INTEL AN4 FIT UP 1A?
PAGE SOUTHERLAND PAGE is the design firm of record for INTEL AN4 FIT UP 1A, according to its TDLR filing.
How much does INTEL AN4 FIT UP 1A cost and how big is it?
INTEL AN4 FIT UP 1A has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
4.1.6 Renovation Alteration - renovation of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 14, 2011
Review Complete
Inspection Complete
Closed
Mar 1, 2012
๐Related Projects
๐คSame Owner
$5.4M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacing galvanized and copper water pipe front yard and underneath home.
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three access holds: one in front one on the side and one behind the house.
Unit 31 building 3. New two story condominium townhome residence covered porch 2 bedroom 2.5 bathroom.
Main elctrica panel upgrade.
Install Level 2 EV Charger
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Business data from Google