GEMALTO 2-3
GEMALTO 2-3 is a renovation/alteration project at 9442 CAPITAL OF TX HWY NORTH, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $190K.
๐Project Metrics
TDLR #EABPRJB2813912Project Closed
Project has been completed and closed
GEMALTO 2-3 is a Renovation/Alteration project located at 9442 CAPITAL OF TX HWY NORTH, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $190K. CB RICHARD ELLIS is the property owner and AO3 INC. is the design firm of record. The project was registered with TDLR on May 31, 2012.
โFrequently Asked Questions
What is GEMALTO 2-3?
GEMALTO 2-3 is a renovation/alteration project at 9442 CAPITAL OF TX HWY NORTH in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation Alteration of existing office space
Is GEMALTO 2-3 open in Austin?
Construction on GEMALTO 2-3 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
Where is GEMALTO 2-3 located?
GEMALTO 2-3 is located at 9442 CAPITAL OF TX HWY NORTH, Austin, TX, 78759, in Travis County.
Who is the owner or developer of GEMALTO 2-3?
CB RICHARD ELLIS is the property owner/developer of record for GEMALTO 2-3, per its TDLR project registration.
Who is the architect or design firm for GEMALTO 2-3?
AO3 INC. is the design firm of record for GEMALTO 2-3, according to its TDLR filing.
How much does GEMALTO 2-3 cost and how big is it?
GEMALTO 2-3 has an estimated construction value of $190K, based on its TDLR filing.
๐Scope of Work
Renovation Alteration of existing office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 31, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2012
๐Related Projects
๐คSame Owner
$99.1M total๐๏ธSame Design Firm
$32.1M total๐Related City Permits
Building permits found at or near this location
Interior remodel of an existing office space.
Interior remodel of an existing office space.
Interior remodel of an existing office space.
Interior remodel of an existing office space.
Interior remodel of existing office space. Scope includes the partial demolition of partitions new partitions renovation to plumbing electrical ceilings lighting and finishings