DR. HORNE DENTAL OFFICE is a additions to existing building project at 5701 W. SLAUGHTER LANE Building B, suite B120, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $212K.
Project has been completed and closed
DR. HORNE DENTAL OFFICE is a Additions to Existing Building project located at 5701 W. SLAUGHTER LANE Building B, suite B120, Austin, TX 78739 in Austin, Texas. The project has an estimated value of $212K. AIM REAL ESTATE GROUP is the property owner and ALLAN NUTT - ARCHITECT is the design firm of record. The project was registered with TDLR on June 19, 2012.
DR. HORNE DENTAL OFFICE is a additions to existing building project at 5701 W. SLAUGHTER LANE Building B, suite B120 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out for dental office.
Construction on DR. HORNE DENTAL OFFICE is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.
DR. HORNE DENTAL OFFICE is located at 5701 W. SLAUGHTER LANE Building B, suite B120, Austin, TX, 78739, in Travis County.
AIM REAL ESTATE GROUP is the property owner/developer of record for DR. HORNE DENTAL OFFICE, per its TDLR project registration.
ALLAN NUTT - ARCHITECT is the design firm of record for DR. HORNE DENTAL OFFICE, according to its TDLR filing.
DR. HORNE DENTAL OFFICE has an estimated construction value of $212K, based on its TDLR filing.
Tenant finish out for dental office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 19, 2012
Review Complete
Inspection Complete
Closed
Nov 1, 2012
Building permits found at or near this location
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
Excavate roughly 20 feet from under the homes foundation to expose damaged/faulty sewer pipe. Cut out all exposed sewer line and replumb using schedule 40 PVC. Hang all new pipe per code using clevis hangers
Connect mobile home and add front deck 6x8 and rear deck 4x4
Interior remodel of two story residence with three bedrooms: Reconfigure bedrooms office laundry bathrooms kitchen and dining. Remove 1 bedroom on first floor and add bedroom on second floor. New windows.
Interior remodel of two story residence with three bedrooms: Reconfigure bedrooms office laundry bathrooms kitchen and dining. Remove 1 bedroom on first floor and add bedroom on second floor. New windows.