GAP #9302
GAP #9302 is a renovation/alteration project at 2901 S. CAPITAL OF TEXAS HWY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2012). The project has an estimated value of $85K.
๐Project Metrics
TDLR #EABPRJB2818626Project Closed
Project has been completed and closed
GAP #9302 is a Renovation/Alteration project located at 2901 S. CAPITAL OF TEXAS HWY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $85K. SIMON MALL is the property owner and PHILLIPS PARTNERSHIP is the design firm of record. The project was registered with TDLR on August 24, 2012.
โFrequently Asked Questions
What is GAP #9302?
GAP #9302 is a renovation/alteration project at 2901 S. CAPITAL OF TEXAS HWY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfigure a bank of (3) fitting rooms as a storage closet by extending walls (outward) and demolishing inner p
Is GAP #9302 open in Austin?
Construction on GAP #9302 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2012. The building is finished and very likely open.
Where is GAP #9302 located?
GAP #9302 is located at 2901 S. CAPITAL OF TEXAS HWY, Austin, TX, 78746, in Travis County.
Who is the owner or developer of GAP #9302?
SIMON MALL is the property owner/developer of record for GAP #9302, per its TDLR project registration.
Who is the architect or design firm for GAP #9302?
PHILLIPS PARTNERSHIP is the design firm of record for GAP #9302, according to its TDLR filing.
How much does GAP #9302 cost and how big is it?
GAP #9302 has an estimated construction value of $85K, based on its TDLR filing.
๐Scope of Work
Reconfigure a bank of (3) fitting rooms as a storage closet by extending walls (outward) and demolishing inner p
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 24, 2012
Review Complete
Inspection Complete
Closed
Nov 1, 2012
๐Related Projects
๐คSame Owner
$181K total๐๏ธSame Design Firm
$55.5M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Per Austin Water we will be installing a backflow prevention device not an RPZ. The installation location in in the dock area near Scarborough and AMC Theaters
Retrofit of an existing tenant fit out. Work includes new and relocated sales floor fixtures floor finish replacement and minor electrical work. Existing Sephora.
In order to install two new customer provided 2500 gallon grease traps a 12 x 10 area of concrete will be removed. This area will be excavated up to 12 in depth. The new grease traps will be installed per manufacture requirements and inspected by the City of Austin. The system will be connected to the existing inlet and outlet piping. Once the new system is in use the existing trap will be pumped cleaned and filled in with pea gravel and topped with concrete.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Individual front lit channel letters reading TJ Maxx on west elevation