Project intelligenceTDLR EABPRJB3805093New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MOSS LAKE WATER TREATMENT PLANT EXPANSIO in Gainesville, TX

209 NORTH LAKE DR., Gainesville, TX, 76240

Construction complete · Jun 2014Project Closed

MOSS LAKE WATER TREATMENT PLANT EXPANSIO is a new construction project at 209 NORTH LAKE DR., Gainesville, in Cooke County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2014). The project has an estimated value of $260K.

Estimated project value
$260K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 7, 2012541 days across supplied datesJun 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    115 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    426 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76240 (Gainesville)

One email per change. Unsubscribe in one click. Privacy.

MOSS LAKE WATER TREATMENT PLANT EXPANSIO is a New Construction project located at 209 NORTH LAKE DR., Gainesville, TX 76240 in Gainesville, Texas. The project has an estimated value of $260K. CITY OF GAINESVILLE is the property owner and HDR ENGINEERING INC. is the design firm of record. The project was registered with TDLR on December 7, 2012.

Frequently Asked Questions

What is MOSS LAKE WATER TREATMENT PLANT EXPANSIO?

MOSS LAKE WATER TREATMENT PLANT EXPANSIO is a new construction project at 209 NORTH LAKE DR. in Gainesville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Operations Building for existing water treatment plant,appropriately 970 square feet, to include two offices, a

Is MOSS LAKE WATER TREATMENT PLANT EXPANSIO open in Gainesville?

Construction on MOSS LAKE WATER TREATMENT PLANT EXPANSIO is complete — TDLR records show the project passed its required accessibility inspection in Jun 2014. The building is finished and very likely open.

Where is MOSS LAKE WATER TREATMENT PLANT EXPANSIO located?

MOSS LAKE WATER TREATMENT PLANT EXPANSIO is located at 209 NORTH LAKE DR., Gainesville, TX, 76240, in Cooke County.

Who is the owner or developer of MOSS LAKE WATER TREATMENT PLANT EXPANSIO?

CITY OF GAINESVILLE is the property owner/developer of record for MOSS LAKE WATER TREATMENT PLANT EXPANSIO, per its TDLR project registration.

Who is the architect or design firm for MOSS LAKE WATER TREATMENT PLANT EXPANSIO?

HDR ENGINEERING INC. is the design firm of record for MOSS LAKE WATER TREATMENT PLANT EXPANSIO, according to its TDLR filing.

How much does MOSS LAKE WATER TREATMENT PLANT EXPANSIO cost and how big is it?

MOSS LAKE WATER TREATMENT PLANT EXPANSIO has an estimated construction value of $260K, based on its TDLR filing.

Scope of Work

Operations Building for existing water treatment plant,appropriately 970 square feet, to include two offices, a

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

209 NORTH LAKE DR., Gainesville, TX, 76240

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76240 (Gainesville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Gainesville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.