Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

INTEL AN4B FIT OUT

1300 S. MOPAC EXPWY, Austin, TX 78746, Austin, TX, 78746
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB3809161
$75K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
6 months
Duration
Registered:Feb 26, 2013
Start:Feb 1, 2013
Target:Aug 1, 2013
๐Ÿ

Project Closed

Project has been completed and closed

INTEL AN4B FIT OUT is a Renovation/Alteration project located at 1300 S. MOPAC EXPWY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $75K. INTEL CORPORATION is the property owner and PAGE SOUTHERLAND PAGE is the design firm of record. The project was registered with TDLR on February 26, 2013.

๐Ÿ“‹Scope of Work

Renovation of 1600 SF of office space to include serverroom

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 26, 2013
Project Closed
August 1, 2013
Construction Start
February 1, 2013
Expected Completion
August 1, 2013

๐Ÿ“…Project Timeline

Filed

Feb 26, 2013

Review Complete

Inspection Complete

Closed

Aug 1, 2013

๐Ÿ“Location & Views

Open in MapsGet Directions|30.26237, -97.79184

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$5.4M total
AN4 1B STARLINE
Austinยท$375K
INTEL AN4 1C COFFEE BAR PROJECT
Austinยท$65K
INTEL AN4-3A RENOVATION PACKAGE
Austinยท$2.5M
INTEL AN4-4C RENOVATION PACKAGE
Austinยท$2.5M

๐Ÿ›๏ธSame Design Firm

$58.1M total
TCH West Campus Level 3 Buildout
Houstonยท$1.5M
HMHCL - PT RENOVATION
Nassau Bayยท$550K
UH SUGAR LAND ACADEMIC BUILDING
Sugar Landยท$43.0M
W.W. SAMUELL HS RENOVATIONS
Dallasยท$13.0M

๐Ÿ“Nearby Projects

Within 1 km
WSP PARSONS BRINCKERHOFF AUSTIN
1501 S. MOPAC, Austin, TX 78746ยท$540K
INTEL AN4-3A RENOVATION PACKAGE
1300 S. MOPAC EXPWY, Austin, TX 78746ยท$2.5M
BARTON SKYWAY TWO - WEST ENTRY
1601 S. MOPAC EXPRESSWAY, Austin, TX 78746ยท$118K
DURBIN BENNETT
1601 S. MOPAC Suite 125, Austin, TX 78746ยท$372K

๐Ÿ“„Related City Permits

Building permits found at or near this location

1300 W OLTORF ST
1.82 mi away

Installation of 37.83 KW Rooftop System for Existing Office/Warehouse

ActiveElectrical PermitAuxiliary PowerApr 2026
View Details
2026-020575 EP
๐Ÿ”งFreedom Solar Power
1300 S PLEASANT VALLEY RD UNIT 255
4.58 mi away

****EMERGENCY INSPECTION-SEE CONDITION NOTE-HYATT*** Waterloo Flats Apartments 1300 S Pleasant Vally Rd Building 6 Unit 255- Disconnect burnt up. Replaced with new disconnect and installed new wire between existing meter housing and disconnect.ย  Site POC: Jorge Esquivel 512.939.3817

FinalElectrical PermitRepairMar 2026
View Details
2026-036717 EP
๐Ÿ”งAirco Mechanical LTD
1300 MC KINLEY AVE
5.42 mi away

44 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - front back. Cannot pass final inspection without Certificate of Occupancy. Please reactivate and pass final inspection for permit # 2008-071771 BP

ActivePlumbing PermitRepairMar 2026
View Details
2026-016901 PP
๐Ÿ”งAccurate Leak & Line
13005 MITICA DR
9.98 mi away

New inground swimming pool and spa w/ reqd enclosure device for existing 2-story single family residence.

ActivePlumbing PermitNewApr 2026
View Details
2026-010881 PP
๐Ÿ”งBuffy's Plumbing
13005 BROADMEADE AVE
13.50 mi away

rebuild existing 200 amp service replace existing loadcenterbreakersriser grounding electrode and meter base Existing service is outdated and in disrepair.

ActiveElectrical PermitUpgradeMar 2026
View Details
2026-033542 EP
๐Ÿ”งPowers Electrical Contracting

Quick Actions

View on TDLRSatellite View
TDLR ID: EABPRJB3809161

Property Owner

๐Ÿ‘ค
INTEL CORPORATION
Contact: Registered by TDLR
4 projects ยท $5.4M
View all projects
MAIL STOP RNB-5-125 2200 MISSION COLLEGE BLVD., SANTA CLARA, CA 95054
(512) 493-3282

Design Firm

๐Ÿ›๏ธ
PAGE SOUTHERLAND PAGE
4 projects ยท $58.1M
View all projects
MICHAEL MACE 400 W. CESAR CHAVEZ, STE 500, AUSTIN, TX 78701
(512) 472-6721

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78746
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects