HERMAN SCHIEFFER HOUSE REHABILITATION is a additions to existing building project at 1154 LYDIA ST., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $800K.
Project has been completed and closed
HERMAN SCHIEFFER HOUSE REHABILITATION is a Additions to Existing Building project located at 1154 LYDIA ST., Austin, TX 78702 in Austin, Texas. The project has an estimated value of $800K. AUSTIN REVITALIZATION AUTHORITY is the property owner and PARSHALL ASSOCIATES ARCHITECTS is the design firm of record. The project was registered with TDLR on March 5, 2013.
HERMAN SCHIEFFER HOUSE REHABILITATION is a additions to existing building project at 1154 LYDIA ST. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation and addition to Historic structure.
Construction on HERMAN SCHIEFFER HOUSE REHABILITATION is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
HERMAN SCHIEFFER HOUSE REHABILITATION is located at 1154 LYDIA ST., Austin, TX, 78702, in Travis County.
AUSTIN REVITALIZATION AUTHORITY is the property owner/developer of record for HERMAN SCHIEFFER HOUSE REHABILITATION, per its TDLR project registration.
PARSHALL ASSOCIATES ARCHITECTS is the design firm of record for HERMAN SCHIEFFER HOUSE REHABILITATION, according to its TDLR filing.
HERMAN SCHIEFFER HOUSE REHABILITATION has an estimated construction value of $800K, based on its TDLR filing.
Rehabilitation and addition to Historic structure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 5, 2013
Review Complete
Inspection Complete
Closed
Dec 1, 2014
Building permits found at or near this location
installing and replacing broken bypass handle meter socket for a commercial residence 120/208 volt 225A three phase
The Bypass switch needs to be repaired.
Replacement of complete existing central heat and air system with or without duct work
change out 2 ton upflow air handler. this is a like for like change out
Replacement of complete existing central heat and air system with or without duct work
City of Austin site plan approvals at this location