BREAKTHROUGH
BREAKTHROUGH is a renovation/alteration project at 1050 E. 11TH STREET, STE 350, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $61K.
๐Project Metrics
TDLR #EABPRJB6821019Project Closed
Project has been completed and closed
BREAKTHROUGH is a Renovation/Alteration project located at 1050 E. 11TH STREET, STE 350, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $61K. AUSTIN REVITALIZATION AUTHORITY is the property owner and KAMPFE DE STIJL INC is the design firm of record. The project was registered with TDLR on July 20, 2016.
โFrequently Asked Questions
What is BREAKTHROUGH?
BREAKTHROUGH is a renovation/alteration project at 1050 E. 11TH STREET, STE 350 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of office only
Is BREAKTHROUGH open in Austin?
Construction on BREAKTHROUGH is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is BREAKTHROUGH located?
BREAKTHROUGH is located at 1050 E. 11TH STREET, STE 350, Austin, TX, 78702, in Travis County.
Who is the owner or developer of BREAKTHROUGH?
AUSTIN REVITALIZATION AUTHORITY is the property owner/developer of record for BREAKTHROUGH, per its TDLR project registration.
Who is the architect or design firm for BREAKTHROUGH?
KAMPFE DE STIJL INC is the design firm of record for BREAKTHROUGH, according to its TDLR filing.
How much does BREAKTHROUGH cost and how big is it?
BREAKTHROUGH has an estimated construction value of $61K, based on its TDLR filing.
๐Scope of Work
Interior renovation of office only
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 20, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2016
๐Related Projects
๐คSame Owner
$922K total๐๏ธSame Design Firm
$100.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Installation of a new internally illuminated cabinet sign for Electric Gravy
CHANGE OF USE ONLY from office to retail food no work proposed
CHANGE OF USE ONLY from office to retail food no work proposed
Install drain connection for new mop-sink. All work performed above floor only/in wall.
Replacement of complete existing central heat and air system with or without duct work
๐Related Site Plans
City of Austin site plan approvals at this location